Two ornamental dams lined in Romsey

Geoline has finished reconstructing and lining two dams on a property in Romsey. Our client advised that his dams received lots of water from the Macedon Ranges yet neither of them would hold water. Geoline advised an impervious 1.5mm HDPE liner to be installed as this would be strong enough to take wild life footprints from surrounding Kangaroos that frequent the area and hold water for irrigation. Geoline shaped up the dams using a 14 ton excavator and sloped part of the dam wall for easy access without the need for access ladders to be installed. 5 ton excavator used to dig anchor trench which was backfilled after the liner was installed and compacted using wacker packer. If you would like your dam to hold water please contact us for a solution.

Shaping up the dam and track rolling in filled areas. Digging anchor trench for plastic liner.
Shaping up the dam and track rolling in filled areas. Digging anchor trench for plastic liner.

Welding equipment used on dam liner to make impermeable.
Welding equipment used on dam liner to make impermeable.
1.5mm HDPE Impermeable Liner
1.5mm HDPE Impermeable Liner
Ornamental pond ready for water.
Ornamental pond ready for water.